Earned value: measure progress in money, not hopes

Earned value compares three numbers: what you planned to have done, what you have actually done, and what it cost. It tells you early whether you are late, over budget, or both.

Guide 06 of 21 · Part of the integrated planning series · 5 minute read
MandateOutcomesPeopleWorkTimeMoneyUncertaintyAdoption

These are the eight planning threads the Krong course is built around. The highlighted ones are covered here. What are the planning threads?

In one lineSPI below 1 means behind schedule. CPI below 1 means over cost. Both are ratios, so you can compare any task or project.

The three inputs

The formulas

MeasureFormulaIt tells you
Schedule varianceEV minus PVAhead or behind, in money
Cost varianceEV minus ACUnder or over spend
SPIEV divided by PVSchedule efficiency
CPIEV divided by ACCost efficiency
EACBudget divided by CPIForecast total cost

Caldera Freight at Week 28

MeasureUSD
Budget at completion2,400,000
Planned value (PV)1,169,333
Earned value (EV)1,034,033
Actual cost (AC)1,102,333
Schedule variance-135,300
Cost variance-68,300
Forecast at completion (EAC)2,558,525

SPI is 0.88 and CPI is 0.94. The project is about 12 per cent behind schedule and 6 per cent over cost. If the trend holds, it will finish around USD 158,500 over budget. The contingency of USD 240,000 covers that, but it leaves little room for anything else.

One work package explains much of the gap. Model development and testing (1.3.2) should be complete: PV is USD 216,700. It has earned USD 184,200 and cost USD 210,000. That gives an SPI of 0.85 and a CPI of 0.88.

Why it is an integrated planning tool

Earned value only works when three things share one structure. The work breakdown defines what is being measured. The schedule says when each piece should be done. The budget says what each piece should cost. Break any of those links and the ratios mean nothing. It also feeds risk: a falling SPI on a critical task is an early warning, and it should change a risk score.

How Sen helps

You enter planned, earned and actual values per work package. Sen sums them, calculates SPI, CPI and the forecast, and shows them beside the contingency. The same numbers flow into the summary page, the board deck and the workbook, so every report agrees.

Questions people ask

What do SPI and CPI mean?

SPI is earned value divided by planned value. CPI is earned value divided by actual cost. Below 1 means behind schedule or over cost.

How do you forecast the final cost?

A common forecast is the budget divided by CPI, called the estimate at completion. It assumes you keep spending at the rate so far.

Do I need earned value on small projects?

It is most useful on projects with a budget and a baseline schedule. On a small project, even a simple percent-complete check against spend gives an early signal.

See it in a real plan

Open Sen and explore the Caldera Freight example. Every figure on this page comes from it. Copy it, change a task, and watch the plan move together.

Open Sen, free   About the course

Keep reading

GUIDE 05
Risk scoring
Score probability and impact, set priority bands, and connect each risk to the work and the contingency.
GUIDE 03
Critical path
Which tasks have no slack, how float works, and how to read a critical path on a real schedule.
GUIDE 01
Integrated planning
Why a plan works only when scope, time, money, risk and people are connected, and how Sen keeps them that way.