Work breakdown structure (WBS): the spine of an integrated plan

A work breakdown structure lists everything the project must deliver, split into pieces small enough to plan, price and own. It is the spine of an integrated plan.

Guide 02 of 21 · Part of the integrated planning series · 5 minute read
MandateOutcomesPeopleWorkTimeMoneyUncertaintyAdoption

These are the eight planning threads the Krong course is built around. The highlighted ones are covered here. What are the planning threads?

In one lineIf it is not in the WBS, it is not in the plan. If it is in the WBS, it gets a duration, a budget and an owner.

How a WBS is built

Start with the project outcome. Split it into a few components. Split each component into work packages. Stop when a package can be estimated, assigned to one team and checked as done.

Give every item an ID such as 1.3.2. Those IDs are the real prize. They let every other part of the plan point to the same piece of work.

Caldera Freight: nine components, 35 work packages

IDComponentBudget (USD)
1.1Project planning and requirements definition180,000
1.2Data acquisition and preparation380,000
1.3Route optimisation platform development650,000
1.4Driver mobile application implementation360,000
1.5Pilot deployment and validation200,000
1.6Full operational deployment150,000
1.7Training and organisational change management320,000
1.8Monitoring and performance reporting system100,000
1.9Post-implementation evaluation60,000
Total2,400,000

The nine components add up to the approved budget. That check is the 100 per cent rule: the pieces must equal the whole, with nothing missing and nothing extra.

Which level holds the budget

Count the levels from the top. Level 1 is the whole project, with one total budget. Level 2 is the components, such as 1.3. Level 3 is the work packages, such as 1.3.2.

A bottom-up estimate prices the lowest level, the work packages, and adds them up: packages make a component, components make the project. The work package budgets are the ones that count. A component budget typed by hand is only a shortcut and can drift away from them.

In Sen, give every work package a budget on the Budget and EVM tab. Then, on the Risk and contingency tab, set Component budgets come from to the sum of each component's task budgets. The component figures, and the way the contingency reserve is shared, then follow the work packages.

Why the IDs matter for integration

Once work package 1.3.2, Model development and testing, exists, the rest of the plan can attach to it.

Common mistakes

How Sen helps

In Sen, the Schedule tab owns the WBS. The RACI matrix, the risk register, the KPI activities and the earned value table all use the same IDs. Add a task once and it shows up in each of them.

Questions people ask

What is a work breakdown structure?

A WBS is a hierarchy that splits a project into components and work packages so each piece can be scheduled, costed and owned.

How detailed should a WBS be?

Detailed enough that each work package can be estimated and assigned to one team. For many projects, packages of two to ten weeks work well.

What is the 100 per cent rule?

The components of a WBS must add up to the whole project scope and budget, with nothing missing and nothing double counted.

See it in a real plan

Open Sen and explore the Caldera Freight example. Every figure on this page comes from it. Copy it, change a task, and watch the plan move together.

Open Sen, free   About the course

Keep reading

GUIDE 03
Critical path
Which tasks have no slack, how float works, and how to read a critical path on a real schedule.
GUIDE 04
RACI matrix
Assign Responsible, Accountable, Consulted and Informed to every task so nothing is left to chance.
GUIDE 01
Integrated planning
Why a plan works only when scope, time, money, risk and people are connected, and how Sen keeps them that way.